CDI electrics was engaged by MPM as part of a larger project to design and install a 100kw grid connected PV system with smoothing for BHP.
The project consisted of 242 x 410GCL Mono solar panels and 115kwh of pylontech battery smoothing. The installation carried out over a 14 day period was completed on time and incident free.